Session 00 Welcome, Introduction, Terms - Dodson
- Session 1- A - Dodson - Terms and Definitions
- Session 1 - A -Dodson - Backup - Practical Reliability Theory
Session 01 - Operational Reliabiltiy 1 - Newhart
- A - Fernandez - Reliability Improvements at the ALBA Synchrotron Light Source Facility
- B - Li - Introduction of Operation Reliability of SSRF
Session 02 - Operational Reliability 2 - Newhart
- A- Spannaus - Testing for ‘New Better than Used’— Oxygen Monitoring Systems at the Spallation Neutron Source
- B - Cao -The development of beam trip diagnostic system for BEPCII storagering
- C - McGilvery - Does an FMEA Improve Accelerator Reliability
- D - -Slabaugh - Fermilab PIP Booster Accelerator RF Cavity Refurbishment
Session 03 - Availability Tracking and Metrics - Giachino
- A - Todd - LHC Availability Studies and Improvements
- B - Arroyo - IFMIF availability oriented design
Session 04 - Fault-Failure Detection and Analysis Methods -Conradie
- A - Nordt - Fault Analysis Methods and their Impact on the Systems Reliability and Beam Availability of Accelerator Driven Facilities
- B - Baggett - Making Good Decisions with Your Reliability Data – A Formalized Approach
- C - Brown - Employing Software for Efficient Retrieval of Reliability Data
Session 05 - Reliability During Facility Machine Design 1 - Giachino
- A - Bargallo - ESS Reliability and availability
- B - Vergara-Fernandez - The ITER Interlock System Status
- C - Apollonio - HL-LHC performance and availability
Session 06 - Reliability during Facility Machine Design 2 - Giachino
- A - Bouly - Reliability and Fault-tolerance strategy in the MYRRHA superconducting Linac
- B - Preddy - Designing for Reliability
- C - Sollander - Reliability of a Future Circular Collider
- C - Sollander - video
Session 07 - Invited Speakers - Dodson
- A - Sims:Durand - Asset Management Strategy - Creating the Master Plan
- B - Gehin - Nuclear Power Reactors – An Example of Improvements in Reliability and Potential for Improvement
Session 08 - Major System Reliabilty 1 - Toma
- A - Uznanski - Radiation Tolerant Power Converter Design for the LHC
- B - Marqueta - LIPAc Control Systems
- C- Andersson - Machine Protection Systems and Their Impact on Availability and Accelerator Reliability
- D - Baglin - Vacuum system reliability illustrated with LHC
Session 09 - Major System Reliabiltiy 2 - McGilvery
- A - Shirakata - Operation Reliability of J-PARC Main Ring
- B - Ayala - LIPAc Grounding Network
- C - Kiy - Automatic Phasing of SCRF Cavities
- D - Proulx - Target Cryogenic Moderator Upgrade for the Hydrogen Gas Management System at SNS
Session 10 - Poster Session - Takada
- A - Cettour Cave -Energy Saving on SPS for Greater Availability and Reliability
- B - Chautard - Consequences of 30 Years of Operation on the of RF Cooling Circuits at GANIL
- C - Katsumata - Efforts on stable operation of the HIMAC irradiation system
- D - Garnodon - The Importance of the Operator for the Reliability of the Machine
- E - McGilvery - Reliability Update for the Australian Synchrotron Light Source
- F - Takao - Status of Operation Reliability at the SPring-8 Storage Ring
- G - Inokuchi - What can we find from failure data of the accelerator
- H - Aikawa - Reproducing beams for therapy and research with replaced power supplies of Main Dipole Magnet in HIMAC synchrotron and HEBT systems
- I - Pozzer - UPGRADE INTERLOCK SYSTEM at Elettra
- J - Rui Introduction of Operation Reliabiltiy of SSRF
- K - Rui-xiong - First Cool-down of Cryogenic System for ADS Injector in CHINA
Session 11 - Maintenance Considerations - Preddy
- A - Foraz - LHC 1st Long Shutdown
- B - Reimann - Scheduling and Tracing of Maintenance Tasks in Long Shutdowns
- C - Sampson - Evolution of Maintenance Practices for RHIC
Session 12 - Special Requirements for Medical Accelerator Facilities - Takada
- A - Conradie - Reliability of the accelerator facilities at iThemba LABS
- B - Schreuder - Reliability and Uptime in Proton Therapy Accelerator and Beam Delivery Systems
- B - Schreuder - Gantry Crash - video
- C - Thorson - A Reliability Retrospective of an Installed Base of 14 Proton Therapy Centers
- D - Derenchuk - A Medical Device Manufacturer’s Perspective of an Accelerator Laboratory
Session 13 - Reliability Improvements- Upgrades - Sampson
- A - Solfaroli - The LHC long shutdown 1 - A Reliable Energy Upgrade
- B - Kerstienes - Water Cooling System Upgrades, Successes, and Lessons Learned From The Los Alamos Neutron Science Center
- C - Shelbaya - Visualizing Tunes
- D - Anderson - Availability Challenges and Solutions Associated with the High Voltage Converter Modulator at the Spallation Neutron Source
Session 14 - Parallel Discussions
- Parallel Session A - Human Performance
- Parallel Session B - Aging Facilities
- Parallel Session D - Communications between workshops, lets keep in touch
Session 15 - Investigation of Failures - Johnson
- A- Young - Dissolved Gas-in-Oil Analysis for Preventative Maintenance of the LANSCE High Voltage Systems
- B - Jago - ISIS Main Ring Dipole Coil Failures
- C - Milanovich - MEBT Water to Vacuum Leak
Session 16 - Innovative Creative Tools - Takao
- A - Johnson - Trend Analysis Software
- B - Curry - Design Strategies used to address Reliability Concerns with the SNS Machine Protection System
- C - Michaud - System Downtime Management at 12 GeV CEBAF
Failure Analysis
Closeout & Announcement of next ARW