Presentations
Download the presentation files (Power Point or PDF) or view online (Slides)
| Tuesday | ||||
| A Study of Neutron Beam Shutter Options at the ESS | Phil Bentley, ESS | |||
| VISION T0 Chopper Vibration | Blake Van Hoy, ORNL | Power Point | ||
| Challenges of Long Beamlines | Leigh Perrott, ISIS | Power Point | ||
| Challenges of measuring long things | Joe Error, SNS | Power Point | ||
| CANDOR Beamline | Nancy Hadad, NIST | |||
| NSE at SNS | Christoph Tiemann, Juelich | Power Point | ||
| ISIS TS2 Phase II Beamlines Update | Nick Webb, ISIS | Power Point | ||
| Wednesday | ||||
| The SNS Second Target Station | Ken Herwig, SNS | Power Point | ||
| TOPAS | Hans Kaemmerling, Julich | Power Point | ||
| Epoxy Floors | Mike Murbach and Colin Wrenn, NIST | |||
| ESS Status | Rob Connatser, ESS | Power Point | ||
| Considerations of RAS in Instrument Design | Iain Sutton, ESS | Power Point | ||
| Corelli Detector Modules | Kevin Berry, SNS | Power Point | ||
| Neutron Imaging Facilities at FRM II | Elbio Calzada, FRM II | Power Point | ||
| Linear Position Sensitive Detector Design | Nathan Johnson, GE R-S | |||
| PTP Based Timing System for TOF Instruments | Daniel Yen, GE R-S |