Presentations
Download the presentation files (Power Point or PDF) or view online (Slides)
Tuesday | ||||
A Study of Neutron Beam Shutter Options at the ESS | Phil Bentley, ESS | |||
VISION T0 Chopper Vibration | Blake Van Hoy, ORNL | Power Point | ||
Challenges of Long Beamlines | Leigh Perrott, ISIS | Power Point | ||
Challenges of measuring long things | Joe Error, SNS | Power Point | ||
CANDOR Beamline | Nancy Hadad, NIST | |||
NSE at SNS | Christoph Tiemann, Juelich | Power Point | ||
ISIS TS2 Phase II Beamlines Update | Nick Webb, ISIS | Power Point | ||
Wednesday | ||||
The SNS Second Target Station | Ken Herwig, SNS | Power Point | ||
TOPAS | Hans Kaemmerling, Julich | Power Point | ||
Epoxy Floors | Mike Murbach and Colin Wrenn, NIST | |||
ESS Status | Rob Connatser, ESS | Power Point | ||
Considerations of RAS in Instrument Design | Iain Sutton, ESS | Power Point | ||
Corelli Detector Modules | Kevin Berry, SNS | Power Point | ||
Neutron Imaging Facilities at FRM II | Elbio Calzada, FRM II | Power Point | ||
Linear Position Sensitive Detector Design | Nathan Johnson, GE R-S | |||
PTP Based Timing System for TOF Instruments | Daniel Yen, GE R-S |